Home Up One Level What's New? Q & A Short Essays Holocaust Denial Guest Book Donations

The Holocaust History Project.

The Holocaust History Project.

Pagr 89 AUSCHWITZ:
Technique and Operation
of the Gas Chambers ©
Previous Page Back Contents Contents Page 89 Home Page Home Page Forward Next Page
Ground floor, roof frame
Section A-B, Section G-H
Basement plan, Section C-D, Section E-F
North elevation, East elevation
(Two other copies of drawing 2197 are known, one showing the drainage. the other both drainage and lighting)
BW 30a/15: Bauleitung drawing 2136 of 22/2/1943
Neg. nos 6231 and 20922/7
Krematorium III, BW 30a. Ergänzungsblatt
Vorderansicht, Seitenansicht. Erdgeschoß Grundriß
Krematorium III, Worksite 30a. Amendment sheet
Front elevation, side elevation, ground floor plan
[Copy of the original]
Kr III
BW30-30a/16: HUTA drawing 109/16a of 9/10/1943
Also dated 25.XI.43
Neg. no. 20922/8 KB (or Projekt) Nr 7015. TB [Technisches Büro] Nr 109,
Blatt Nr l6a
Krematorium 2(3)
Construction (or project) no. 7015, Technical Office no. 109,
Sheet no. 16a
Krematorium II (and III)
(HUTA drawing based on Bauleitung drawings 933 and 934)
Kr II/III
BW30-30a/17: HUTA drawing 109/15 of 24/9/1943
Neg. no. 20922/9
Krematorium 2(3)
Kellergeschoß u. Fundamente
Krematorium II (and III)
Basement and foundations
(HUTA drawing based on Bauleitung drawing 932)
Kr II/III
B W30/18: HUTA drawing, no number or date
Neg. no. 20946/2
Hand written title: “Krema 2”
[Title omitted, should be:] Erdaushub
Grundriß, Schnitt a-a, Schnitt b-b
[Excavation]
Plan view, Section a-a. Section b-b
[Copy of the original Huta drawing 109/13a]
Kr II
BW30a/19: HUTA drawing 109/14a of 23/9/1943
Also dated 25.XI.43
Neg. no. 20922/11
Krematorium 3 — Erdaushub
Grundriß,, Schnitt a-a, Schnitt b-b
Krematorium III — Excavation
Plan view, Section a-a, Section b-b
Kr III
BW30/19a: HUTA drawing 109/13a of 21/9/1943
Also dated 25.XI.43
Neg. no. 20922/10
Krematorium 2 — [omitted title: “Erdaushub”]
Krematorium II — [Excavation] 
Kr II
BW 30/20: Konrad SIEGNITZ drawing 1305 of 7/8/1942
(Holzliste 637 to 39) - (Timber lists 637 to 39)
[Baugeschäft Konrad Siegnitz, Eisenbeton u.
Hochbau, Beuthen, upper Silesia, Lindenstraße
38]
Neg. no. 20946/3
Vollmar Bohlen Binder Dachkonstruktion
Für Bau: KGL BW 30
Zentralbauleiting der Waffen-SS und Polizei - Auschwitz
Längschnitt, Draufsicht, Schnitt Hauptdach
Schnitt Seitenflügel, Schornsteinschnitt, Punkt A
Roof frame in "Vollmar" [Vollmechanisierung /
Full mechanization?] beams
For building: POW camp BW 30
Waffen SS and Police Central Construction Management Auschwitz
Longitudinal section, Plan view, Main roof
cross-section
Wing cross-section. Chimney section, Point A
In statischer Hinsicht geprüft. Beuthen, upper
Silesia,
Lindenstraße 46, on 31/8/42. Prüfingenieur bei
der statischen Prüfstelle, Beuthen, Upper Silesia,
Baurat A Bsdok.
Static calculations checked by the authorised
inspection engineer Baurat A Bsdok of Beuthen
on 31/8/42
Received at the Bauleitung on 3/9/42 by Ertl
and Bischoff
Kr II
BW30/21: File containing two HUTA drawings:
(1) — Huta drawing 109/10 of 13/11/1942
Neg. no. 20946/4
Auschwitz Kr - Decke über dem
Müllverbrennungsraum Unterzug I u. II
(Pos. 41 u. 42) Schnitt a-a, Türsturz (Pos. 16) Auschwitz Kr - Ceiling over the waste incinerator
room
Cross-beams I and II (items 41 and 42)
Section a-a, Door lintel (item 16)
Kr II
(2) — Huta drawing 109/11 of 1/3/1943
Neg. no. 20946/5
Krema — Deckenbalken im Müllverbrennungsraum
Schnitt a-b. Unterzug im Müllverbrennungsraum
Krema — Main ceiling beam in the waste incinerator
room Section a-b, cross-beam in the waste
incinerator room
Kr II
BW 30b- 30c/22: Bauleitung drawing 1678 of 14/8/1942
Neg. no. 20946/6
Einäscherungsanlage im KGL
Giebelansicht, Schnitt a-b, Ansicht
Erdgeschoßgrundriß. Fundamentplan
Cremation installation in the POW camp
Gable end elevation, Section a-b, Elevation
Ground floor plan, Foundation plan
Kr IV
BW 30b- 30c/23: Bauleitung drawing 2036 of 11/1/1943
Neg. nos 6234 and 20818/10
Einäscherungsanlage im KGL
Deckblatt für die Zeichnung Nr 1678
Querschnitt A-B, Querschnitt C-D, Ansicht
Erdgeschoßgrundriß
Cremation installation in the POW camp
Correction sheet for drawing 1678
Cross-section A-B, Cross-section C-D,
Elevation
Ground floor plan
Kr IV/V
AUSCHWITZ:
Technique and operation
of the gas chambers

Jean-Claude Pressac
© 1989, The Beate Klarsfeld Foundation
Previous Page Back Page 89 Forward Next Page

   

Last modified: March 9, 2005
Technical/administrative contact: webmaster@holocaust-history.org