|
|
|
AUSCHWITZ:
Technique
and Operation
of
the Gas Chambers © | |
|
|
|
Back |
|
Contents |
Page 142 |
|
Home
Page |
Forward |
|
|
|
|
Document M: [PMO BW 30/06, neg.
no 20818/8] |
|
|
|
|
“Entwurf für das Krematorium /
projected crematorium” South elevation Bauleitung drawing 938, scale
1:100 Drawn on 15th January 1942 by SS Sergeant Ulmer, checked on
28th January by SS Second Lieutenant Dejaco and approved on the same
day by Captain Bischoff. |
|
|
|
|
|
After it was decided to transfer
this crematorium from K L Auschwitz to K G L Birkenau, this drawing
was copied and included in Bauleitung drawing 936 of 15.1.42 showing
the four facades of the future Krematorium II, oriented according to
its implantation in Birkenau. This façade thus became that facing
east. In addition, the half-buried roof of the Liechenkeller /
corpse cellar 1, located perpendicular to the south facade, was
added. |
| |
|
AUSCHWITZ: Technique
and operation of the gas chambers Jean-Claude Pressac © 1989, The
Beate Klarsfeld Foundation |
|
Back |
Page 142 |
Forward |
|
|