| 
 | 
  | 
  
  
    
      
        
        
            | 
          AUSCHWITZ: 
                                     Technique 
            and Operation 
                                         of 
            the Gas Chambers ©  |    |  
  
     |  
  
    |   |  
  
      | 
    Back  | 
      | 
     Contents | 
    Page 142 | 
      | 
    Home 
      Page  | 
    Forward | 
       |  
  
    |       |   
  
  
    
      
        
        
            |  
        
          
             
           |  
        
           Document M:  [PMO BW 30/06, neg. 
            no 20818/8] |   
      
        
        
          |   | 
            | 
            |  
        
          |   | 
          “Entwurf für das Krematorium / 
            projected crematorium” South elevation Bauleitung drawing 938, scale 
            1:100 Drawn on 15th January 1942 by SS Sergeant Ulmer, checked on 
            28th January by SS Second Lieutenant Dejaco and approved on the same 
            day by Captain Bischoff.  | 
            |  
        
          |   | 
            | 
            |  
        
          |   | 
          After it was decided to transfer 
            this crematorium from K L Auschwitz to K G L Birkenau, this drawing 
            was copied and included in Bauleitung drawing 936 of 15.1.42 showing 
            the four facades of the future Krematorium II, oriented according to 
            its implantation in Birkenau. This façade thus became that facing 
            east. In addition, the half-buried roof of the Liechenkeller / 
            corpse cellar 1, located perpendicular to the south facade, was 
            added.   | 
            |    |   
  
  
    |   |  
  
    AUSCHWITZ:  Technique 
      and operation  of the gas chambers Jean-Claude Pressac © 1989, The 
      Beate Klarsfeld Foundation |  
  
      | 
     Back | 
    Page 142 | 
    Forward | 
       |   
 |