|
|
Document 16/I [PMO file BW
30/27, pages 13 and 14] |
|
|
Translation: |
|
Correspondence register no. 12115/42/Er/Ha |
|
Summary record |
|
Subject: |
Visit of Chief Engineer Prüfer,
of Messrs Topf & Sons of Erfurt regarding the construction of
incineration installations at Auschwitz POW camp
[Birkenau]. |
Proceedings: |
Herr Eng. Prüfer came to our
office on 19/8/42 at 2 pm in order to discuss details of the
installation of 5 3 muffle incineration furnaces in the POW camp
Krematorium and a new type of simplified installation of 2 3 muffle
furnaces, as shown on drawings D 59,570 and D 59,599. |
|
The following was agreed: |
|
1) |
The fitter [Martin] Holi[c]k
will arrive here from Buchenwald not later than 26th or 27th August
and fitter [Willi] Koch in about 14 days. The construction of the 5
3 muffle furnaces will commence immediately. Messrs Köhler [or
Koehler] of Myslowitz will line the furnaces and the flues and will
erect the chimney in accordance with Topf & Sons drawings and
instructions. |
2) |
Regarding the installation of each of the
2 3 muffle furnaces near the “bathing installation for special
actions”, Engineer Prüfer suggested that these furnaces should be
taken from a consignment already prepared for shipment to Mogilew.
The Head of the appropriate service of the SS Economic and
Administrative Head Office in Berlin [SS WVHA] was immediately
informed by telephone and requested to take the appropriate
steps. |
3) |
Regarding the construction of a 2nd
crematorium with 5 3 muffle furnaces, together with the ventilation
and air extraction systems, it will be necessary to await the result
of negotiations already under way with the Reich Security Main
Office [RSHA] on the subject of rationed materials. |
|
- 2
- |