Drawing 1173-1174
(p) |
|
|
|
Translation of inscriptions:
(left to right and top to bottom) |
|
Drawing 1174: |
|
- |
Erdanschüttung / earth
bank. |
- |
Vorlage / hard fill. |
- |
Gewachsener Boden / natural
earth. |
- |
Absetzgrube / drainage
ditch. |
- |
Rutsche / [corpse] chute.
|
- |
Belüftung /
ventilation |
- |
Unterzug / joist. |
- |
Eisenbeton - Bohlendecke /
reinforced concrete roof beams. |
- |
Aufzug / corpse lift.
|
- |
Entlüftung / air extraction.
|
- |
Entlüftungskanal / air
extraction duct. |
- |
Verbrennungsraum / incineration
room [furnace room]. |
- |
Betonboden m[it] Glattstr[ich] /
concrete floor with smooth screed. |
- |
Vorlage 18cm HGH [?] / 18cm hard
fill ... |
- |
Gewachsener Boden / natural
earth. |
|
|
Drawing 1173: |
|
- |
Anschüttung / earth bank. |
- |
Belüftungskanal vom Dachgeschoss
/ ventilation duct from roof space. |
- |
Entlüftungskanal - Verbindung
[unter d. N.G. Fussboden] / air extraction duct junction [below new
ground level]. |
- |
Belüftungskanal - Verbindung /
ventilation duct junction. |
- |
Anschüttung / earth
bank. |
- |
Entlüftungskanal zum
Dachgeschoss / extraction duct to roof space. |
- |
Neue Geländehöhe / new ground
level. |
- |
Gewachsener Boden / natural
earth. |
- |
KREMATORIUM — Zutritt verboten /
CREMATORIUM — keep out
|