Drawing 1305 by the civilian firm
Messrs Konrad Segnitz
[PMO file BW 30/20, neg. no.
20946/3] |
|
VOLLMAR BOHLEN BINDER DACHKONSTRUKTION FÜR BAU: KGL BW
30 ZENTRALBAULEITUNG der WAFFEN SS und POLIZEI - AUSCHWITZ /
Roof frame in “Vollmar” beams for building: POW camp BW 30
Waffen SS and Police Central Construction Management Auschwitz
M. /Scales 1:100 and 1:10 Drawn on 7/8/42 Statistics
checked by the inspection engineer A Bsdok on 31/8/42 received
on 4/9/42 and countersigned by SS Sergeant Ertl and SS Captain
Bischoff |
|
Translation of inscriptions
(left to right and top to bottom) |
|
· |
Längsschnitt / Longitudinal
section [actually cross section] |
· |
Draufsicht / Plan
view |
· |
Schornsteinbreite / Chimney
widths [of the ventilation ducts] |
· |
68 Stk Vollmarbohlenbinder / 68
“Vollmar” beams |
· |
Schnitt Hauptdach / Main roof
cross section |
· |
Kronendacheiedeckung / Ridge
covering |
· |
Binderabstand / Distance between
beams |
· |
Punkt A / Point A |
· |
Wechsel / Supporting
plate |
· |
Schnitt Seitenflübel /Wing
cross-section |
· |
Jeden 4 cm Binder A[n]ker gegen
Soc[kel?] / Beam anchor every 4 con against plate [?] |
· |
Kragstiene /
Firebrick |
· |
Schornsteinschnitt / Chimney
cross-section |
|
|
|
The longitudinal and plan views
on this drawing were inspired respectively by Bauleitung drawings
933 934 and 980. The chimney cross section is from Bauleitung
drawing 1434 of 3/6/42, “Errichtung eines Schornsteines am
Krematorium / Construction of a chimney at the Krematorium [II]”, a
drawing not found after the Liberation.
This civilian
drawing brings nothing new with respect to the Bauleitung drawings,
except that the height of the ventilation chimney is shown for the
first time. |