AUSCHWITZ:
Technique
and Operation
of
the Gas Chambers © | |
|
|
|
Back |
|
Contents |
Page 324 |
|
Home
Page |
Forward |
|
|
|
|
|
HUTA SHEET14A
|
|
Huta Sheet 14a shows that the excavations for the
Leichenkeller of Krematorium III had steeper sides than those of
Kr II, which explains the difference in the surface dimensions.
The length of the foundations of the annex wing is increased here
from 12 meters for Kr II to 14 meters. The Huta cross-section of
Leichenkeller 2 as compared with Bauleitung drawing 934 (above the
Huta drawing) shows a thickening of the concrete floor and a
strengthening of the roof. On this drawing it would appear that
the cross-beams are no longer deeper at the ends, where they join
the walls, thus interfering less with the air-extraction duct. But
on Sheet 16a, a cross-section of Leichenkeller 2 shows that the
cross-beams ARE still thickened at the ends…
|
|
|
HUTA DRAWING 109/14A
OF 21/9/43 [PMO Archives, file BW 30a/19, neg. no.
20922/1] |
|
|
Bauherr: Waffen SS u. Police,
Auschwitz / Auschwitz Waffen SS and Police Betr.: Krematorium 3
/ Subject: Krematorium 3 [III] Erdaushub / Excavation
Technical no. 109, Sheet 14a Project no. 7015 Scales
1:50 [Leichenkeller cross-sections] and 1:200 [Krematorium]
|
|
|
|
|
|
Translation of
inscriptions: |
|
|
|
|
· |
Schnitt b-b / Cross-section b-b
[Leichenkeller 2] |
|
· |
Grundriß / Plan view |
|
· |
Schnitt a-a / Cross-section a-a
[Leichenkeller 1] |
| |
|
AUSCHWITZ: Technique
and operation of the gas chambers Jean-Claude Pressac © 1989, The
Beate Klarsfeld Foundation |
|
Back |
Page 324 |
Forward |
|
|