Translation of inscriptions: |
|
• |
Reine Seite / clean
side |
• |
Drahtgitter ca 2.50m hoch /
steel grid approx 2.50 meters high |
• |
Gefälle 5cm / 5cm
slope |
• |
Blausäure - Entlausungsanlage /
prussic acid delousing installation |
• |
Unreine Seite / dirty
side |
• |
Kammer / chambers (from 1 to
19) |
• |
Sockel / base |
• |
Siehe Detail der Fa BOOS / see
detail drawing by Messrs Boos |
• |
Vorraum / anteroom |
• |
Auskleideraum / undressing
room |
• |
Waschraum für SS M. / bathroom
for SS personnel |
|
This drawing shows
that the SS were not afraid to undress and shower THREE meters from
gas chambers using hydrocyanic acid (i.e. Zyklon-B). The delousing
building is shown directly attached to the reception building,
without communicating corridors, as on the KL Auschwitz general plan
of 19/2/1942. |