|
Drawing 3: Bauleitung drawing 1293
of 9/5/1942 [PMO neg. No. 20932/3] |
|
|
|
|
|
BE- UND ENTWASSERUNG DER ENTLAUSUNGSBARACKE IM KGL /
Water supply and drainage in the delousing building of the prisoner
of war camp |
|
|
|
|
|
Scale 1:100 Drawn 9th May 1942 by prisoner No.
18356, checked by Untersturmführer Eggeling on 11th May and
approved by Hauptsturmführer Bischoff the same day. |
|
|
|
|
• |
Massstab / scale. |
|
• |
Pumpenraum / pump room |
|
• |
Schnitt a-b / cross section a-b (toilets) |
|
• |
Schnitt c-d / cross section c-d (shower room) |
|
|
|
|