Home Up One Level What's New? Q & A Short Essays Holocaust Denial Guest Book Donations

The Holocaust History Project.

The Holocaust History Project.

Page 57 AUSCHWITZ:
                        Technique and Operation
                            of the Gas Chambers ©
 
 
Previous Page Back  Contents  Contents Page 57 Home Page Home Page  Forward Next Page 
     
Page 57
 
 
Drawing 4:
Bauleitung drawing 1715 of 25/9/1942
[PMO neg. No. 20930/9] 
 
ENTLAUSUNGSBEBÄUDE IM KGL / EINBAU EINER SAUNAANLAGE / DECKBLATT ZUR Nr 801 / POW camp delousing building / installation of a sauna / correction sheet for drawing 801     
 
•    Schnitt a-b / cross section of sauna    
•    Schnitt c-d / longitudinal section of sauna   
•    Entlüftung / air extraction or natural ventilation   
•    O.E Gelände / ground level   
•    Saunaofen / sauna stove   
•    Sauna / sauna   
•    Sitz u. Liegebrücken / benches for sitting and lying   
•    Entwesungsapparat / disinfestation equipment   
•    Entwesungskammer / disinfestation chamber   
•    Unreine S[eite] / dirty side   
•    Reine S[eite] / clean side   
•    Desinfektion / disinfection (sic)   
•    Ankleide R[aum] / dressing room    
•    Gereinigte Wäsche / clean linen   
•    5 cm Heraklithsplatten / panel of 5cm heraklith   
  
AUSCHWITZ:
Technique and operation
of the gas chambers

Jean-Claude Pressac
© 1989, The Beate Klarsfeld Foundation
Previous Page  Back Page 57 Forward  Next Page

   

Last modified: March 9, 2005
Technical/administrative contact: webmaster@holocaust-history.org