|
 |
 |
AUSCHWITZ:
Technique
and Operation
of
the Gas Chambers © | |
|
|
 |
Back |
 |
Contents |
Page 58 |
 |
Home
Page |
Forward |
|
|
 |
Drawing 5: Bauleitung drawing No. 2540 of 5/71943
[PMO neg. No. 20932/5] |
|
EINBAU EINER HEISSLUFTENTLAUSUNG IN DER ENTWESUNGSBARACKE IM F.L /
Installation of hot air delousing in the disinfestation building of
the womens' camp |
|
|
Scale 1:100, drawn by
prisoner No. 127 on 5th July 1943. checked by SS
Untersturmtführer Dejaco and Janisch and approved by an
unidentified officer the same day |
|
|
|
|
• |
Heizung / heating |
|
• |
Brennstoff / fuel |
|
• |
Heissluftapparat / hot air
generator |
|
• |
Brausenraum (50 Brausen) /
shower room (50 showers). |
| |
|
AUSCHWITZ: Technique
and operation of the gas chambers Jean-Claude Pressac © 1989, The
Beate Klarsfeld Foundation |
 |
Back |
Page 58 |
Forward |
 |
|