|
|
Drawing 2:
Bauleitung
drawing 1846 of 25/11/42 [PMO neg. me 20930/1] |
|
Desinfektions u. Entwesungsanlage, Keller /
disinfection and disinfestations installation, basement
Drawn by prisoner 538 on 25/11/42, checked by Dejaco and
approved by Bischoff on 28/11/42 Scale 1:100. |
|
Translation of the
inscriptions: |
|
• |
Kellergeschossgrundriss /
basement plan |
|
• |
Nichtunterkellerter Teil / part
with no basement |
|
• |
Heizraum / boiler room |
|
• |
Handpumpe / hand pump |
|
• |
Frischlufteintritt / fresh air
intake |
|
• |
Brennstoffr. / fuel
store |
|