Drawing 8:
Bauleitung drawing 2184: |
|
|
Desinfektions- und Entw.
Fundamentgrube / foundation excavations for the disinfection and
disinfestation installation. Fundamentgrube der Entwesungsofenanlage
für B.W. 32 als Wassenlichte Wanne / foundation excavation for the
disinfestation oven installation for B.W. 32 as a watertight
basin. |
|
|
Scale 1:100. drawn by prisoner
538. checked by Dejaco and countersigned by Bischoff on
17/3/43. |
|
|
This drawing, with three cross
sections of the disinfestation "ovens" is not presented. It
indicates that Entwesungsofen = Entwesungskammer and that the agent
used in this installation is dry heat i.e., very hot
air. |
|
|
|
|
|
Drawing 9:
Bauleitung drawing 2451 [PMO neg. no. 220943/17]
|
|
|
|
|
|
Kanalisation Entwesungsanlage
und Kanal 23. Lageplan 1:200 (Kanalisation K.G.L Effektenlager B.W.
18) / drainage of the disinfestation installation and sewer 23,
situation plan 1:200 (drainage of the effects camp [Kanada II] B.W.
18)
The designation B.W. covers all drainage and sewage work
whatever the Bauabschnitt / construction stage at Birkenau.
Scale 1:200 Drawn by prisoners 89711 and 89722 [though
probably only the second number is valid, the first being struck
through] on 24/5/33. checked by Janisch and approved by Bischoff
on 29/5/43 |
|
|
. |
|