|
Translation of
inscriptions: |
|
|
|
|
• |
Schnitt a-b / cross section
a-b |
|
• |
5cm Heraklithplatten / 5cm
Heraklith panel |
|
• |
Spar-Binder / roof
truss |
|
• |
O.K. Gelände / ground level
|
|
• |
Isolierung /
damp-proofing |
|
• |
Aufschültung / fill |
|
• |
für die Starke der
Eisenbetonplatte ist stat. Berechnung massgebend / the thickness of
the reinforced concrete slab is to be determined by static
calculation |
|
• |
Vorlage 12cm Ziegelmauerwerk
oder Magerbeton / bed of 12cm brick or lean concrete |
|
• |
Vormauerung 12cm / 12cm
frost-resistant layer |
|
• |
Schnitt c-d / cross section
c-d |
|
• |
Grundwasserspiegel / water table
level |
|
• |
Massivdecke / solid
ceiling |
|
• |
Nord-Ansicht / north
elevation |
|
• |
Ost-Ansicht / east
elevation |
|
• |
West-Ansicht / west
elevation |
|
|
|
|
|
The cross section a-b does not
show the additional pressure vessel installed. |
|
|
|
|
The four chimneys for
the hot air disinfestation chambers and the collective one connected
to the basement boiler room producing hot water for the central
heating and showers and steam for the three autoclaves are perfectly
visible.
In the right hand corner of the drawing,
handwritten in red is "Geprüft / checked, 14th July 1943. No.
34142/43" with a date, 16th August 1943 and the signature of
Teichmann, a Bauleitung civilian employee.
|