|
TRANSLATION OF
INSCRIPTIONS |
|
|
|
|
|
Zeichenerklärung /
Key |
|
|
|
ungereinigtes Schmutzwasser /
untreated dirty water mechanisch gereinigtes - abwasser /
mechanically purified waste water mechanisch und biologisch
gereinigtes Abwasser / mechanically and biologically purified waste
water Faulschlamm / Sludge |
|
|
· |
Zaun des KGL / POW camp
enclosure |
|
|
· |
Vorflut KGL / POW camp drainage
channel |
|
|
· |
Schmutzwasserkanal / dirty water
channel |
|
|
· |
Grob[b]rechen / primary
screening |
|
|
· |
Sandfang / sand trap |
|
|
· |
Faulgruben / decomposition
beds |
|
|
· |
Rohwasser ungereinigt /
untreated dirty water |
|
|
· |
Verdünnungsleitung / dilution
channel |
|
|
· |
Graben A / drainage ditch
A |
|
|
· |
Entwasserungsleitung / drainage
channel |
|
|
· |
Schlammleitung / sludge
channel |
|
|
· |
Feldbahn / narrow gauge
railway |
|
|
· |
Biological Tropfkörper /
biological purification basins [with rotary sprays] |
|
|
· |
Nachklärbecken / final
decantation basin |
|
|
· |
Pumpenhaus / pump house |
|
|
· |
Verteilschacht für Verdünnung /
dilution distribution well |
|
|
· |
Schlamm-Faulbecken / sludge
digestion basin [open-air] |
|
|
· |
Schwimmschlammbecken / floating
sludge basin |
|
|
· |
mechanisch. gerein. Abwasser /
mechanically purified waste water |
|
|
· |
Hoch wasserdruckleitung / high
water pressure conduit |
|
|
· |
gereinigtes Abwasser / purified
waste water |
|
|
· |
Schlammleitung zum Trockenplatz
/ sludge channel to drying bed |
|
|
· |
Hochwasserschutzdamm / high
water protection dam |
|
|
· |
Königsgraben / “King's ditch”.
[main drainage ditch] |
|
|
· |
Zur Weichsel / to the
Vistula |
|
|
|
|
|
Drawing 1855 is not
the final plan for Kläranlage II, but does show the actual locations
of the main components of the station. The final decantation basin
was to be transferred to the south of the station and replaced by a
fourth biological purification basin. These 4 basins were never
completed and remained as they are to he seen today (photographs in
the Bauleitung Album: PMO neg. nos 20995/449 [Photo 12a],
/450 and /452). The primary screening was modified and strengthened.
The floating sludge basin was never dug. The purification station
was coupled with 4 a “provisional” earth decantation or
sedimentation basins to the west of the station (where the Ulm
company’s stamp is on the drawing). Only the decomposition beds were
ever brought into operation. |
|