PARTIAL TRANSLATION OF DOCUMENT NI-11115 PROSECUTION EXHIBIT
1426 |
| |
| EXTRACTS FROM MINUTES OF FIRST CONSTRUCTION CONFERENCE ON IG
PLANT AUSCHWITZ AT FARBENS LUDWIGSHAFEN PLANT, 24 MARCH 1941,
CONCERNING NECESSARY COOPERATION BETWEEN EXPERTS OF FARBENS LUDWIGSHAFEN
AND LEUNA PLANTS IN THE CONSTRUCTION, DISTRIBUTION OF FUNCTIONS, VARIOUS
CONSTRUCTION PROBLEMS, HOUSING OF STAFF; REPORT OF DEFENDANT DUERRFELD ON
CONFERENCE WITH SS GENERAL WOLFF ON THE ROLE OF THE AUSCHWITZ CONCENTRATION
CAMP, AND RELATED MATTERS |
| |
| |
TABW/Hk Lu 314 31 March 1941 Gu |
|
| |
| IG Plant Auschwitz* First Construction conference on 24 March 1941
in Ludwigshafen on Rhine |
| |
Present:
| |
Director Dr. Ambros |
Senior Engineer Dr. Mach |
| |
Director Dr. von Staden |
Dr. Eisfeld |
| |
Director Dr. Eymann |
Senior Engineer Faust |
| |
Senior Engineer Dr. Duerrfeld |
Certified Engineer Heidebroek |
| |
Senior Engineer Santo |
|
|
| |
In his introduction, Ambros welcomes the gentlemen present to
the first construction conference for the new Auschwitz plant, and emphasizes
the special advantages of cooperation between the Leuna Ludwigshafen plants. He
expresses his conviction that, through friendly relations on the part of the
experts of the two plants, a firm basis is assured for speedy and successful
work and that, therby, in spite of the difficulties to be expected in the East,
a guarantee for the establishment of a successful enterprise is provided.
As to procedure, Ambros proposes that construction conferences should
be held at short regular intervals for the time being, weekly in
Ludwigshafen, Leuna, and later in Auschwitz, in which, as far as possible, all
competent experts should participate. In these first con- [
ferences]
|
__________ * The initials of the
defendant ter Meer appear at the bottom of the first page.