| Materials The entire stock (about 265 tons) of material
already delivered goes to Groeditz. The purchase orders for material not yet
delivered will be assembled for Groeditz. |
| |
| Delivery address: |
Mitteldeutsche Stahlwerke G.m.b.H Groeditz via Riesa
Machine Construction Department. |
|
| |
Similarly, the same applies to subgroups, standard parts, finished
parts, etc., ordered elsewhere.
Administrative questions
How administrative work connected with the order is to be transferred from
ELMAG to Groeditz has in no wise been discussed.
Execution of
plans In what order the machines are to be dismantled and shipped
can be seen from special annotations in the machine list.
If freight
cars are ordered in time, raw materials, semifinished and finished products
will be sent with the machines. If not, construction material and equipment
will be sent ahead.
How quickly the transfer is to take place will
depend entirely on the transport situation.
According to agreements
between the Supreme Command of the Wehrmacht and the Armaments Commission, the
antiaircraft guns will be transferred in list lb, that is, after the products
named in list la have been transferred. Therefore, one cannot count on
transportation (freight cars or trucks) being immediately available. It is not
possible, for the moment, to say when the transfer can begin. Mulhouse, Alsace,
24 September 1944.2/K. |
| |
| |
[Signed] HUPE [Handwritten] HUPE [Signed] DR. SCHUMACHER
[Handwritten] DR. SCHUMACHER |
|
| |
Copies to Groeditz (4) Armament Inspectorate (3)
ELMAG: Mr. Hupe Mr. Collignon Mr. Biegi Mr. Koralek
Mr. Perdrizet Mr. Zimmermann |
614 |