|
|
|
AUSCHWITZ:
Technique
and Operation
of
the Gas Chambers © | |
|
|
|
Back |
|
Contents |
Page 34 |
|
Home
Page |
Forward |
|
|
|
Drawing 2 Bauleitung drawing 916 |
ENTWURF FÜR AUFNAHMEGEBÄUDE MIT ENTLAUSUNGSANLAGE U. HÄFTLINGSBAD /
Project for reception building with a delousing installation and prisoners
baths.
"AUFNAHMEGEBÄUDE, ERDEGESCHOSS / reception building (BW
160], ground floor" Drawing 916 Scale 1:100 drawn by W. UHL
(ZA / civilian employee, draughtsman) on 30/12/41, checked by
Walter DEJACO on 6/1/42 and approved by BISCHOFF on 8/1/42.
The
civilian draftsman who made this drawing worked in the Drawing Office
under Untersturmführer DEJACO. His particular style of producing drawings
and keys is practically identical to the point of confusion, with that of
SS Unterscharführer Ulmer who also worked in the Bauleitung Drawing
Office. Ulmer was probably sent from Berlin to Auschwitz to work as a
draughtsman and architect and was then posted to a combat unit as from
February 1943. It is he who drew the 930 series "Krematorium
project" drawings. The reception building comprises two wings in which
there are two distinct circuits for operations.
|
AUSCHWITZ: Technique
and operation of the gas chambers Jean-Claude Pressac © 1989, The
Beate Klarsfeld Foundation |
|
Back |
Page 34 |
Forward |
|
|